Accomplishments to date

Installed two new heat pumps (replaced old fuel oil furnance and removed buried fuel tank)

Removed the Pews

Replaced well water pump

Received approval from Township to request building permits

Removed all the maple hardwood flooring - denailed and stacked

Rewired the main electrical service and replaced all but 2 of the original wiring lines

Installed Internet and WIFI

Installed a new toilet

Installed a new shower

Installed a new hybrid high efficiency hot water heater (old one 20 years old)

Replaced all the plumbing with PEX flexible supply lines and a manifold to distribute water

Installed a whole house water filter - no more rust stains or odors

Installed a new stove

Laid out and dry fitted waste drains for new main floor bathrooms

Passed Building Inspection for Framing  

Passed Building Inspection for Electrical & Plumbing on 16 May

LeeAnna tiled the two new bathrooms on the main floor

Installed new ducting for main floor (28 hrs)