Completed framing of bedroom, master bath, and powder room.
Passed first Building Inspection for framing
Powder room, master bath and bedroom framed
Brother John came up this weekend to get the majority of the framing complete.
Delivery of lumber and plywood for the new floor
Jigs for cutting the wedges to level the main floor
1st row of new sub floor down - we are on our way to a level floor
Almost half way done with the sub floor
Filling in a corner
This is the fun part
Last of the leveling wedges installed
LeeAnna now showing how to use the framing nailer
LeeAnna showing her stuff cutting the subflooring
Installing the last subfloor plywood
Subfloor Complete!!!!!