Completed framing of bedroom, master bath, and powder room.

Passed first Building Inspection for framing

 

Powder room, master bath and bedroom framed

Brother John came up this weekend to get the majority of the framing complete.

Delivery of lumber and plywood for the new floor

Jigs for cutting the wedges to level the main floor

1st row of new sub floor down - we are on our way to a level floor

Almost half way done with the sub floor

Filling in a corner

This is the fun part

Last of the leveling wedges installed

LeeAnna now showing how to use the framing nailer

LeeAnna showing her stuff cutting the subflooring

Installing the last subfloor plywood

Subfloor Complete!!!!!